Comparison of BIM work stages
This article attempts to compare the different work stage definitions that have been adopted in standard industry BIM documentation.
|
PAS 1192 |
APM (listed in CIC BIM protocol) |
RIBA 2013 |
(attributed to PAS 1192) |
| 1 Brief | 0 Strategy | 0 Strategic definition | 1Brief |
| 1 Brief | 1 Preparation and brief | ||
| 2 Concept | 2 Concept | 2 Concept design | 2 Concept |
| 3 Definition | 3 Definition | 3 Developed design | 3 Developed design |
| 4 Design | 4 Design (production information) | 4 Technical design (Procurement is flexible and does not have a numbered stage) | 4 Production |
| 5 Build & Commission | 5 Build & Commission | 5 Construction | 5 Installation |
| 6 Handover & Closeout | 6 Handover & Closeout | 6 Handover & Closeout | 6 As constructed |
|
In use (no number) |
7 Operation and end of life | 7 In use | 7 In use |
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles
Check out some of the best features and news from Designing Buildings as well as key stories from around the web.
Dorset's first conservation campaigner?
Gov.uk - Hot-rolled steel plate
New anti-dumping measure imposed on South Korea.
ECA responds to the Milburn Report
Youth employment to be linked to workforce demand.
The construction industry urgently needs to attract new talent
CIOB responds to Neets report.
Grenfell Tower community update
Memorial columns to be retained as careful dismantling continues.
When buildings reflected the local resources available.
CIOB reports 57% are using artificial intelligence technologies.
More of England’s ‘hidden heroes’ will be celebrated.
CIAT calls for retrofit to be a priority.
Version 6 is now available, along with guidance for ECA members.
Post-War Homes: mid-century British architecture. Book review.
CIAT reflects on the party conferences.